Union Pacific GE ES44AC No. 5417 leads a westbound UP freight past milepost 822 as the train climbs Peru Hill between Green River and Peru, Wyoming, on the afternoon of June 22, 2023.
An impressive 10 unit lashup, including three standard cabs, a CP rebuild, and an SD90/43AC, lead an eastbound UP manifest past the Rochelle Railroad Park.
Passing the west switch at Mortmar, UP 5417 passes a pair of ex SP searchlights as it races east with the ZLAJX.
Meet me at Warren. A trio of UP "California" GEVOs drag up the Mojave Sub on the point of the MWCFR-21. The rear DPU on the ZLTLA can be seen rounding the curve on main 1.
UP rumbles up the grade thru Oakridge, on it's way to Klamath Falls via the Cascade Summit.
5417 roars up the hill through Oakridge, past a long line of stored center beams.
A head-on shot of the daily MRVSJ passing through the Fremont-Centerville Amtrak Station.
A cab profile of a filthy C45AC (aka GEVO) as the crew tucks the power away for the night in the Newhall Yard.